Solar installation company in Brisbane QLD secured CE/RCM-compliant inverters at 45% cost reduction with 8-week delivery vs 6-month local lead time.
Savings
45% cost reduction; inverter stock delivered in 8 weeks vs 6 months from local distributor
Verification
RCM documentation accepted by Australian authorities; electrical compliance confirmed
“I spent 4 months trying to get one Chinese inverter onto the Australian market. WAG had it done in 6 weeks including the compliance paperwork.”
— Andrew K., Solar Installer, Brisbane
Verified raw material suppliers and OEM manufacturers for Australian aesthetics clinics and cosmetics brands.
Read case studyAgriculture & FarmingPrecision agriculture UAVs sourced directly from Shenzhen manufacturers with CASA compliance support.
Read case studyElectronics & TechnologyConsumer and commercial audio equipment from verified Shenzhen factories — verified before shipment.
Read case study